Chloroplant is entering into a strategic partnership with KOMS Inc., a distinguished engineering firm based in South Korea, to develop advanced foundations for next-generation wind turbines. KOMS specialise in offshore wind substructures and boasts a robust legacy of three decades of expertise drawn from the oil and gas sector. Our goal is to leverage the technological advancements we have acquired over the years to benefit humanity and contribute positively to the future of the global environment.

K-WIND is a batch self-installation method without WITV or other special fleets, and installs FOWT at 1/3 the cost and time of the existing method, and has excellent productivity during production.

VIDEO

K-WIND HYBRID is a special type of FOWT that combines quick installation and safety to replace existing floating offshore wind power.

KTW system can shorten the construction period of offshore wind farms. Mooring and subsea cable work can be installed at sea simultaneously with FOWT fabrication and final connection work can be easily achieved.

DMS system can be applicable for FOWT right now, and the world's first two-way latch system has been applied to enable rapid attachment and detachment of mooring lines.

Approval in Principle